{"id":197,"date":"2014-12-04T08:23:21","date_gmt":"2014-12-04T08:23:21","guid":{"rendered":""},"modified":"2022-07-18T16:14:00","modified_gmt":"2022-07-18T12:44:00","slug":"snohetta-unveils-final-design-calgarys-new-central-library","status":"publish","type":"post","link":"https:\/\/jobinbolourchi.com\/index.php\/2014\/12\/04\/snohetta-unveils-final-design-calgarys-new-central-library\/","title":{"rendered":"Sn\u00f8hetta Unveils Final Design for Calgary\u2019s Central Library"},"content":{"rendered":"<p class=\"intro\">Sn\u00f8hetta and DIALOG have released the final design for their competition-winning New <a href=\"http:\/\/www.archdaily.com\/551086\/snohetta-unveils-final-design-for-calgary-s-new-central-library\/\" target=\"_blank\" rel=\"noopener noreferrer\">Central Library <\/a>in Calgary.<\/p>\n<p>Planned for a vibrant intersection between Downtown Calgary and the East Village, the new library aims to fulfill the city\u2019s vision for a \u201ctechnologically advanced public space for innovation, research and collaboration.\u201d<\/p>\n<blockquote><p>The exterior\u2019s fritted glass openings are strategically transparent in library\u2019s most public areas as an attempt to encourage pedestrians to enter.<\/p><\/blockquote>\n<p>The encapsulation of the existing Light Trail Train is currently underway, and the new Calgary Public Library is expected to be completed in 2018.<\/p>\n\n<p>At its mid-section, the building lifts to form an arched, wood-clad entry that serves as a new public plaza and directly connects pedestrians through the site from the neighboring communities.<\/p>\n<p>All images are under copyright \u00a9\u00a0<a href=\"http:\/\/snohetta.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Sn\u00f8hetta<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sn\u00f8hetta and DIALOG have released the final design for their competition-winning New Central Library in Calgary. At its mid-section, the building lifts to form an arched..<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[2],"tags":[8,9,11],"class_list":["post-197","post","type-post","status-publish","format-standard","hentry","category-architecture-2","tag-building","tag-cultural-2","tag-news"],"_links":{"self":[{"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/posts\/197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/comments?post=197"}],"version-history":[{"count":1,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/posts\/197\/revisions"}],"predecessor-version":[{"id":252,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/posts\/197\/revisions\/252"}],"wp:attachment":[{"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/media?parent=197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/categories?post=197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jobinbolourchi.com\/index.php\/wp-json\/wp\/v2\/tags?post=197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}